SANTA FE BLVD over BERENDA SLOUGH
0.2 MI N/W OF AVE 27 · County 039, California · Built 1968 · 2 Lanes · 259 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
37.143653, -120.162283
This bridge is in worse condition than 90.8% of bridges in County 039. The average bridge in California is 0 years old; this one is 58 years old.
Nearby Bridges
SANTA FE BLVD over ASH SLOUGH
Built 1956
SANTA FE BLVD over CHOWCHILLA RIVER
Built 1973
AVENUE 26 over BERENDA SLOUGH
Built 1975
ROAD 19 over ASH SLOUGH
Built 1981
AVENUE 27 1/2 over MADERA CANAL
Built 1948
COUNTY ROAD 19 over CHOWCHILLA RIVER
Built 1998
CR 19 over BERENDA SLOUGH
Built 1991
BUCHANAN HOLLOW RD over DUTCHMAN CREEK #1
Built 1960
BUCHANAN HOLLOW RD over DUTCHMAN CREEK #2
Built 1930
BAXTER ROAD over S FORK DUTCHMAN CREEK
Built 1941
Bridge Details
- Structure #
- 41C0012
- Year Built
- 1968
- Length
- 55.5 m (182.1 ft)
- Max Span
- 9.1 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 259
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $519,000
- Total Project Cost
- $2,005,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.