EL CAPITAN WAY over HIGH LINE CANAL
0.25 MI W PEPPER ST · County 047, California · Built 1925 · 2 Lanes · 948 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
37.4338, -120.726428
This bridge is in worse condition than 59% of bridges in County 047. The average bridge in California is 0 years old; this one is 101 years old.
Nearby Bridges
NORTH AVENUE over HIGH LINE CANAL
Built 1940
CORTEZ ROAD over HIGH LINE CANAL
Built 1940
BRADBURY ROAD over HIGH LINE CANAL
Built 1940
SOUTH AVE over HIGH LINE CANAL
Built 1940
SECOND AVENUE over HIGH LINE CANAL
Built 1940
LOMBARDY AVENUE over HIGH LINE CANAL
Built 1940
BIRD STREET over HAMMATT LATERAL
Built 2005
STATE ROUTE 99 NB over COLLIER ROAD
Built 1997
STATE ROUTE 99 SB over COLLIER ROAD
Built 1997
SYCAMORE STREET over HIGH LINE CANAL
Built 1940
Bridge Details
- Structure #
- 39C0306
- Year Built
- 1925
- Length
- 6.4 m (21 ft)
- Max Span
- 6.1 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 948
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.