VAN CLIEF ROAD over EAST SIDE CANAL

0.25 MI. N. OF THIRD AVE. · County 047, California · Built 2001 · 2 Lanes · 300 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
39C0122
Year Built
2001
Length
22.9 m (75.1 ft)
Max Span
9.3 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
300
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.