HENRY MILLER AVE over CCID MAIN CANAL

2.0 MI E I-5 · County 047, California · Built 1996 · 2 Lanes · 2,835 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
39C0056
Year Built
1996
Length
13.2 m (43.3 ft)
Max Span
6.1 m
Width
19.3 m (63.3 ft)
Lanes
2
Daily Traffic
2,835
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.