CAMPUS PARKWAY over STATE RTE 140 RAILROAD

10-MER-140-38.25-MER · County 047, California · Built 2020 · 2 Lanes · 1,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
39 0249R
Year Built
2020
Length
94.8 m (311 ft)
Max Span
51.1 m
Width
15.9 m (52.2 ft)
Lanes
2
Daily Traffic
1,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.