INTERSTATE 5 NB over SR 152

10-MER-005-17.55 · County 047, California · Built 1966 · 3 Lanes · 20,750 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
39 0161R
Year Built
1966
Length
84.1 m (275.9 ft)
Max Span
31.1 m
Width
20.7 m (67.9 ft)
Lanes
3
Daily Traffic
20,750
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.