STATE ROUTE 33 over ARROYO CANAL
10-MER-033-4.64 · County 047, California · Built 1918 · 2 Lanes · 5,200 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
37.036525, -120.63555
This bridge is in worse condition than 59% of bridges in County 047. The average bridge in California is 0 years old; this one is 108 years old.
Nearby Bridges
STATE ROUTE 33 over POSO SLOUGH
Built 1962
AZUSA ROAD over SAN JUAN CANAL
Built 1922
STATE ROUTE 152 over SAN JUAN CANAL
Built 1969
DENTON ROAD over SAN JUAN CANAL
Built 1959
STATE ROUTE 152 EB over STATE ROUTE 33
Built 1969
STATE ROUTE 152 WB over STATE ROUTE 33
Built 1969
PALM AVENUE over SAN JUAN CANAL
Built 1959
PALM AVENUE over ARROYO CANAL
Built 1976
SANTA RITA GRADE over SAN JUAN CANAL
Built 1950
PALM AVENUE over POSO SLOUGH
Built 1966
Bridge Details
- Structure #
- 39 0053
- Year Built
- 1918
- Reconstructed
- 1962
- Length
- 31.8 m (104.3 ft)
- Max Span
- 5.3 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 5,200
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.