8TH & 9TH STREET over M.I.D. LATERAL #4

S/O KANSAS · County 099, California · Built 1914 · 6 Lanes · 9,356 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
38C0062
Year Built
1914
Length
7.6 m (24.9 ft)
Max Span
3.6 m
Width
32 m (105 ft)
Lanes
6
Daily Traffic
9,356
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.