STATE ROUTE 99 SB over 7TH STREET & UP RR
10-STA-099-R14.03 · County 099, California · Built 1963 · 3 Lanes · 52,500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 4 | Poor |
Location
37.616744, -120.986611
This bridge is in worse condition than 86.5% of bridges in County 099. The average bridge in California is 0 years old; this one is 63 years old.
Nearby Bridges
STATE ROUTE 99 NB over 7TH STREET & UP RR
Built 1963
STATE ROUTE 99 NB over 9TH STREET
Built 1963
STATE ROUTE 99 SB over 9TH STREET
Built 1963
CROWS LANDING ROAD over STATE ROUTE 99 & RAMP
Built 1963
9TH STREET over TUOLUMNE RIVER RIVER RD
Built 2004
HATCH ROAD over 9TH-S99 7TH ST & UP RR
Built 1962
HATCH ROAD over STATE ROUTE 99
Built 1962
SEVENTH STREET over TUOLUMNE RIVER
Built 1916
STATE ROUTE 99 NB over ZEFF RD & TUOLUMNE RIVER
Built 1963
STATE ROUTE 99 SB over ZEFF RD & TUOLUMNE RIVER
Built 1963
Bridge Details
- Structure #
- 38 0076L
- Year Built
- 1963
- Length
- 101.8 m (334 ft)
- Max Span
- 33.2 m
- Width
- 15.9 m (52.2 ft)
- Lanes
- 3
- Daily Traffic
- 52,500
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,617,000
- Total Project Cost
- $2,716,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.