STATE ROUTE 99 SB over 7TH STREET & UP RR

10-STA-099-R14.03 · County 099, California · Built 1963 · 3 Lanes · 52,500 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
38 0076L
Year Built
1963
Length
101.8 m (334 ft)
Max Span
33.2 m
Width
15.9 m (52.2 ft)
Lanes
3
Daily Traffic
52,500
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,617,000
Total Project Cost
$2,716,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.