WEST SAINT JOHN over GUADALUPE RIVER

BTWN AUTUMN ST & RIVER ST · County 085, California · Built 1935 · 2 Lanes · 2,140 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
37C0742
Year Built
1935
Length
39.9 m (130.9 ft)
Max Span
13.7 m
Width
18.4 m (60.4 ft)
Lanes
2
Daily Traffic
2,140
Material
Concrete Continuous
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.