SAN ANTONIO VLY RD over ISABEL CREEK
8.3 MI EAST OF KINCAID RD · County 085, California · Built 2018 · 2 Lanes · 50 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
37.356264, -121.589689
This bridge is in worse condition than 10.9% of bridges in County 085. The average bridge in California is 0 years old; this one is 8 years old.
Bridge Details
- Structure #
- 37C0608
- Year Built
- 2018
- Length
- 40.8 m (133.9 ft)
- Max Span
- 40.2 m
- Width
- 11.8 m (38.7 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.