FRAZIER LAKE ROAD over BRANCH OF PAJARO RIVER

0.4 MI S/E BLOOMFIELD AVE · County 085, California · Built 1927 · 2 Lanes · 3,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
37C0535
Year Built
1927
Reconstructed
2004
Length
11.3 m (37.1 ft)
Max Span
5.6 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
3,800
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.