SOUTHWEST EXPWY over MERIDIAN AVENUE
S/O I-280 INTCHNG · County 085, California · Built 1972 · 3 Lanes · 10,100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
37.3131, -121.914906
This bridge is in worse condition than 10.9% of bridges in County 085. The average bridge in California is 0 years old; this one is 54 years old.
Nearby Bridges
SOUTHWEST EXPWY over MERIDIAN AVENUE
Built 1972
MERIDIAN ROAD (NB) over INTERSTATE 280
Built 1972
MERIDIAN ROAD (SB) over INTERSTATE 280
Built 1972
RACE STREET over INTERSTATE 280
Built 1970
NB I-280 OFF-RAMP over I-280 & RACE STREET
Built 1972
MERIDIAN ST over LOS GATOS CREEK
Built 1900
SB I-280 OFF RAMP over LINCOLN AVENUE
Built 1969
INTERSTATE 280 SB over LINCOLN AVENUE
Built 1969
INTERSTATE 280 NB over LINCOLN AVENUE
Built 1969
LEIGH AVENUE over INTERSTATE 280
Built 1972
Bridge Details
- Structure #
- 37C0052R
- Year Built
- 1972
- Length
- 65.5 m (214.9 ft)
- Max Span
- 33.2 m
- Width
- 15.2 m (49.9 ft)
- Lanes
- 3
- Daily Traffic
- 10,100
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.