INTERSTATE 880 NB over HETCH HETCHY AQUEDUCT

04-SCL-880-8.00-MPS · County 085, California · Built 2003 · 1 Lanes · 11,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
37 0669M
Year Built
2003
Length
16.6 m (54.5 ft)
Max Span
5.9 m
Width
7.1 m (23.3 ft)
Lanes
1
Daily Traffic
11,500
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.