INTERSTATE 880 NB over HETCH HETCHY AQUEDUCT
04-SCL-880-8.00-MPS · County 085, California · Built 2003 · 1 Lanes · 11,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
37.419303, -121.914022
This bridge is in worse condition than 10.9% of bridges in County 085. The average bridge in California is 0 years old; this one is 23 years old.
Nearby Bridges
SB880 CONN&OFFRAMP over HETCH HETCHY AQUEDUCT
Built 2002
E&W237-S880 RAMP over S880-TASMAN DR OFF RAMP
Built 2004
TASMAN DRIVE WB over INTERSTATE 880
Built 1995
TASMAN DRIVE EB over INTERSTATE 880
Built 1995
TASMAN DRIVE over BARBER LANE
Built 1996
TASMAN DRIVE over BARBER LANE
Built 1996
MACHADO AVENUE over PENETENCIA CREEK
Built 2006
ALVAREZ COURT over PENETENCIA CREEK
Built 2006
STATE ROUTE 237 EB over INTERSTATE 880 & RAMPS
Built 1972
STATE ROUTE 237 WB over INTERSTATE 880 & RAMPS
Built 1972
Bridge Details
- Structure #
- 37 0669M
- Year Built
- 2003
- Length
- 16.6 m (54.5 ft)
- Max Span
- 5.9 m
- Width
- 7.1 m (23.3 ft)
- Lanes
- 1
- Daily Traffic
- 11,500
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.