DIXON LANDING RD over INTERSTATE 880

04-SCL-880-10.42-MPS · County 085, California · Built 2002 · 8 Lanes · 124,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
37 0581
Year Built
2002
Length
100.2 m (328.7 ft)
Max Span
50.9 m
Width
36.5 m (119.8 ft)
Lanes
8
Daily Traffic
124,400
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.