NB RTE 85 ON-RAMP over S85-S280 CONNECTOR RAMP

04-SCL-085-R18.33-SUNV · County 085, California · Built 1993 · 1 Lanes · 6,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
37 0544S
Year Built
1993
Length
43.3 m (142.1 ft)
Max Span
42.4 m
Width
9.6 m (31.5 ft)
Lanes
1
Daily Traffic
6,600
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.