NB STATE ROUTE 85 over SAN TOMAS AQUINO CREEK
04-SCL-085-R12.68-CMB · County 085, California · Built 1994 · 3 Lanes · 57,500 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
37.269767, -121.990667
This bridge is in worse condition than 10.9% of bridges in County 085. The average bridge in California is 0 years old; this one is 32 years old.
Nearby Bridges
SB STATE ROUTE 85 over SAN TOMAS AQUINO CREEK
Built 1994
WESTMONT AVENUE over SAN TOMAS AQUINO CREEK
Built 1980
QUITO RD over WILDCAT CREEK
Built 1979
QUITO ROAD over STATE ROUTE 85
Built 1994
POLLARD RD over SAN TOMAS AQUINO CREEK
Built 1976
SB STATE ROUTE 85 over POLLARD ROAD
Built 1994
NB STATE ROUTE 85 over POLLARD ROAD
Built 1994
QUITO RD over SAN TOMAS CREEK
Built 1915
MCCOY AVE over SAN TOMAS AQUINO CREEK
Built 1970
HARRIET AVE over SAN TOMAS AQUINO CREEK
Built 1974
Bridge Details
- Structure #
- 37 0524R
- Year Built
- 1994
- Length
- 32 m (105 ft)
- Max Span
- 31.1 m
- Width
- 18 m (59.1 ft)
- Lanes
- 3
- Daily Traffic
- 57,500
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.