SB 85 OFF-RAMP over 17-SB 85 CONNECTOR NB

04-SCL-085-R10.30-LGTS · County 085, California · Built 1994 · 2 Lanes · 4,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
37 0495K
Year Built
1994
Length
99.1 m (325.1 ft)
Max Span
42.1 m
Width
12.1 m (39.7 ft)
Lanes
2
Daily Traffic
4,300
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.