STATE ROUTE 87 SB over PEDESTRIAN WALKWAY

04-SCL-087-4.20-SJS · County 085, California · Built 1990 · 4 Lanes · 65,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
37 0434L
Year Built
1990
Reconstructed
2007
Length
26.4 m (86.6 ft)
Max Span
25.8 m
Width
20.7 m (67.9 ft)
Lanes
4
Daily Traffic
65,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.