NB87-NARVAEZ OFFRP over CAPITOL EXPRESSWAY

04-SCL-087-1.34-SJS · County 085, California · Built 1993 · 1 Lanes · 30,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
37 0415S
Year Built
1993
Length
73.1 m (239.8 ft)
Max Span
36.2 m
Width
8.3 m (27.2 ft)
Lanes
1
Daily Traffic
30,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.