SB STATE ROUTE 87 over CURTNER AVENUE

04-SCL-087-2.84-SJS · County 085, California · Built 1993 · 4 Lanes · 55,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
37 0362L
Year Built
1993
Length
71 m (232.9 ft)
Max Span
37.6 m
Width
21.8 m (71.5 ft)
Lanes
4
Daily Traffic
55,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.