LAWRENCE EXPWY over STATE ROUTE 82

04-SCL-082-14.34-SCL · County 085, California · Built 1970 · 8 Lanes · 74,069 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
37 0337
Year Built
1970
Reconstructed
1996
Length
68.9 m (226 ft)
Max Span
28.3 m
Width
35.4 m (116.1 ft)
Lanes
8
Daily Traffic
74,069
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.