U.S. HWY 101 (SB) over STATE ROUTE 152

04-SCL-101-R7.52-GIL · County 085, California · Built 1973 · 3 Lanes · 26,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
37 0328L
Year Built
1973
Length
48.8 m (160.1 ft)
Max Span
48.5 m
Width
16.2 m (53.1 ft)
Lanes
3
Daily Traffic
26,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.