I-680 ON/OFF-RAMP over CAPITOL EXPRESSWAY

04-SCL-680-M1.41-SJS · County 085, California · Built 1974 · 2 Lanes · 14,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
37 0288K
Year Built
1974
Length
61.6 m (202.1 ft)
Max Span
30.5 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
14,800
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.