NB INTERSTATE 280 over LA BARRANCA WAY
04-SCL-280-16.56-LAH · County 085, California · Built 1967 · 4 Lanes · 58,500 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
37.371372, -122.142883
This bridge is in worse condition than 47.3% of bridges in County 085. The average bridge in California is 0 years old; this one is 59 years old.
Nearby Bridges
SB INTERSTATE 280 over LA BARRANCA WAY
Built 1967
NB INTERSTATE 280 over ROBLEDA ROAD
Built 1967
SB INTERSTATE 280 over ROBLEDA ROAD
Built 1967
SAMUEL LANE over DEER CREEK
Built 1996
DEER CREEK LANE over DEER CREEK
Built 2013
SB INTERSTATE 280 over ELENA ROAD
Built 1967
NB INTERSTATE 280 over ELENA ROAD
Built 1967
ELENA RD over ADOBE CREEK
Built 1965
SB INTERSTATE 280 over ARASTRADERO ROAD
Built 1967
NB INTERSTATE 280 over ARASTRADERO ROAD
Built 1967
Bridge Details
- Structure #
- 37 0233R
- Year Built
- 1967
- Length
- 25.7 m (84.3 ft)
- Max Span
- 24.9 m
- Width
- 21.2 m (69.6 ft)
- Lanes
- 4
- Daily Traffic
- 58,500
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.