ISBEL DR over BRANCIFORTE CREEK

0.2 MI N OF HWY 1 · County 087, California · Built 1971 · 2 Lanes · 2,015 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
36C0145
Year Built
1971
Length
12.6 m (41.3 ft)
Max Span
12 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
2,015
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$121,000
Total Project Cost
$203,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.