MURRAY-EATON ST over WOODS LAGOON
W/O INT/O LUKE AVE · County 087, California · Built 1963 · 2 Lanes · 25,000 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
36.967961, -122.003281
This bridge is in worse condition than 84% of bridges in County 087. The average bridge in California is 0 years old; this one is 63 years old.
Nearby Bridges
EAST CLIFF DRIVE over UP RR
Built 1990
RIVERSIDE AVE over SAN LORENZO RIVER
Built 1990
E CLIFF DR over SAN LORENZO RIVER
Built 1926
OCEAN ST over BRANCIFORTE CREEK
Built 1963
LAUREL ST over SAN LORENZO RIVER
Built 1968
DAKOTA STREET over BRANCIFORTE CREEK
Built 1959
SOQUEL AVE over SAN LORENZO RIVER
Built 1999
EAST CLIFF DRIVE over CORCORAN LAGOON
Built 1978
WATER STREET over BRANCIFORTE CREEK
Built 1924
WEST CLIFF DRIVE over RAILROAD AND VIADUCT LN
Built 2001
Bridge Details
- Structure #
- 36C0108
- Year Built
- 1963
- Length
- 165.5 m (543 ft)
- Max Span
- 18.3 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 25,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,754,000
- Total Project Cost
- $2,946,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.