PLEASANT WAY over SAN LORENZO RIVER

0.1 MI W OF SR 9 · County 087, California · Built 1949 · 1 Lanes · 400 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
36C0070
Year Built
1949
Length
18.5 m (60.7 ft)
Max Span
17.3 m
Width
4.6 m (15.1 ft)
Lanes
1
Daily Traffic
400
Material
Steel
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$184,000
Total Project Cost
$309,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.