LOMAND ST over SAN LORENZO RIVER
0.5 MI E SR 9 · County 087, California · Built 1941 · 2 Lanes · 3,000 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
37.125903, -122.119489
This bridge is in worse condition than 84% of bridges in County 087. The average bridge in California is 0 years old; this one is 85 years old.
Nearby Bridges
STATE ROUTE 9 over BOULDER CREEK
Built 1931
BEAR CRK RD over SAN LORENZO RIVER
Built 1954
STATE ROUTE 9 over SAN LORENZO RIVER
Built 1937
IRWIN WAY over SAN LORENZO RIVER
Built 1955
STATE ROUTE 236 over BOULDER CREEK
Built 1921
BRIMBLECOM RD over SAN LORENZO RIVER
Built 1948
STATE ROUTE 236 over BOULDER CREEK
Built 1921
LARKSPUR ST over SAN LORENZO RIVER
Built 1957
STATE ROUTE 9 NB over HILLSIDE
Built 2018
FOREST HILL DR over BEAR CREEK
Built 1961
Bridge Details
- Structure #
- 36C0055
- Year Built
- 1941
- Length
- 32 m (105 ft)
- Max Span
- 21.3 m
- Width
- 9.3 m (30.5 ft)
- Lanes
- 2
- Daily Traffic
- 3,000
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $298,000
- Total Project Cost
- $500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.