STATE ROUTE 9 NB over HILLSIDE

05-SCR-009-8.50 · County 087, California · Built 2013 · 2 Lanes · 21,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
36 0113
Year Built
2013
Length
42.2 m (138.5 ft)
Max Span
8.3 m
Width
1.7 m (5.6 ft)
Lanes
2
Daily Traffic
21,100
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.