STATE ROUTE 9 NB over HILLSIDE

05-SCR-009-10.75 · County 087, California · Built 2002 · 2 Lanes · 10,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
36 0109
Year Built
2002
Reconstructed
2022
Length
47.7 m (156.5 ft)
Max Span
9.5 m
Width
3.6 m (11.8 ft)
Lanes
2
Daily Traffic
10,000
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.