NORFOLK STREET over SAN MATEO CREEK

SOUTH OF 3RD AVE · County 081, California · Built 2001 · 5 Lanes · 14,780 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
35C0184
Year Built
2001
Length
13.7 m (44.9 ft)
Max Span
13 m
Width
26.2 m (86 ft)
Lanes
5
Daily Traffic
14,780
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.