PILARCITOS CREEK R over PILARCITOS CREEK
0.46 MI N OF S.H. 92 · County 081, California · Built 1910 · 2 Lanes · 42 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Superstructure
3
Serious
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Superstructure | 3 | Serious |
| Substructure | 4 | Poor |
Location
37.498667, -122.384997
This bridge is in worse condition than 99.7% of bridges in County 081. The average bridge in California is 0 years old; this one is 116 years old.
Nearby Bridges
STATE ROUTE 92 over PILARCITOS CREEK
Built 1965
BUNKER HILL DRIVE over INTERSTATE 280
Built 1969
INTERSTATE 280 over SAN MATEO CR CRYSTAL SPR
Built 1967
INTERSTATE 280 SB over STATE ROUTE 92
Built 1973
INTERSTATE 280 NB over STATE ROUTE 92
Built 1973
N280-W92 CONNECTOR over INTERSTATE 280 SR 92
Built 1974
S280-E92 CONNECTOR over INTERSTATE 280 SR 92
Built 1973
CRYSTAL SPRINGS RD over SAN MATEO CREEK
Built 1974
RALSTON POLHEMUS R over STATE ROUTE 92
Built 1967
TARTAN TRAIL RD over SAN MATEO CREEK
Built 1964
Bridge Details
- Structure #
- 35C0111
- Year Built
- 1910
- Length
- 7.9 m (25.9 ft)
- Max Span
- 6.1 m
- Width
- 8.2 m (26.9 ft)
- Lanes
- 2
- Daily Traffic
- 42
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $60,000
- Total Project Cost
- $231,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.