D ST-S280&S1 ONRMP over I 280 SULLIVAN-S280 RMP

04-SM-280-R25.60-DLC · County 081, California · Built 1993 · 2 Lanes · 24,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
35 0315K
Year Built
1993
Length
434.8 m (1426.5 ft)
Max Span
48.8 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
24,100
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.