U.S. HIGHWAY 101 over OYSTER POINT DRAIN

04-SM-101-22.90-SSF · County 081, California · Built 1995 · 9 Lanes · 196,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
35 0307
Year Built
1995
Length
12.7 m (41.7 ft)
Max Span
5.8 m
Lanes
9
Daily Traffic
196,000
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.