INTERSTATE 280 NB over AVALON DRIVE
04-SM-280-R22.04-SSF · County 081, California · Built 1971 · 4 Lanes · 50,500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
37.639756, -122.441875
This bridge is in worse condition than 90.3% of bridges in County 081. The average bridge in California is 0 years old; this one is 55 years old.
Nearby Bridges
INTERSTATE 280 SB over AVALON DRIVE
Built 1971
INTERSTATE 280 SB over WESTBOROUGH BLVD
Built 1967
INTERSTATE 280 NB over WESTBOROUGH BLVD
Built 1967
NIMITZ DRIVE over FORK DRIVE
Built 1940
SNEATH LANE over INTERSTATE 280
Built 1971
W380-N280 CONNECTR over N280 ON-RAMP COLLECTOR
Built 1971
SNEATH LN over HILLSIDE
Built 1975
W380-S280 CONNECTR over I 280 CONN FRNTGE RD
Built 1971
INTERSTATE 280 over HILLSIDE
Built 1994
S280-SAN BRUNO OFF over INTERSTATE 380 (FUTURE)
Built 1973
Bridge Details
- Structure #
- 35 0228R
- Year Built
- 1971
- Length
- 43.6 m (143 ft)
- Max Span
- 24.4 m
- Width
- 21.2 m (69.6 ft)
- Lanes
- 4
- Daily Traffic
- 50,500
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $924,000
- Total Project Cost
- $1,552,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.