NB STATE RTE 280 over SERRAMONTE BOULEVARD

04-SM-280-R24.63-DLC · County 081, California · Built 1967 · 4 Lanes · 89,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
35 0209R
Year Built
1967
Length
39.3 m (128.9 ft)
Max Span
21.3 m
Width
21.2 m (69.6 ft)
Lanes
4
Daily Traffic
89,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$833,000
Total Project Cost
$1,399,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.