S280-CRYSTAL SP OR over WHITMAN WAY

04-SM-280-R20.22-SBR · County 081, California · Built 1967 · 2 Lanes · 5,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
35 0197K
Year Built
1967
Length
47.6 m (156.2 ft)
Max Span
16.6 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
5,600
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.