US HIGHWAY 101 NB over GIRARD ROAD

04-SF-101-R8.29-SF · County 075, California · Built 2015 · 2 Lanes · 18,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
34 0165R
Year Built
2015
Length
62.1 m (203.7 ft)
Max Span
27.2 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
18,000
Material
Prestressed Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.