ROUTE 1 over RUCKMAN AVE SCHOFIELD RD

04-SF-001-6.93-SF · County 075, California · Built 2012 · 4 Lanes · 64,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
34 0156
Year Built
2012
Length
125.3 m (411.1 ft)
Max Span
27.7 m
Width
21.7 m (71.2 ft)
Lanes
4
Daily Traffic
64,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.