MORRISON CANYON RD over MORRISON CANYON
0.8 MILES EAST OF RTE 238 · County 001, California · Built 1998 · 1 Lanes · 150 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
37.570425, -121.949622
This bridge is in worse condition than 57.1% of bridges in County 001. The average bridge in California is 0 years old; this one is 28 years old.
Nearby Bridges
STATE ROUTE 238 over ALAMEDA CREEK
Built 1937
OLD CANYON RD over ALAMEDA CREEK
Built 1948
STATE ROUTE 84 over ALAMEDA CREEK
Built 2022
STATE ROUTE 84 over ALAMEDA CR UPRR BNSF ACE
Built 1947
SB OFFRAMP VARGAS over VARGAS ROAD
Built 2010
INTERSTATE 680 over VARGAS ROAD
Built 1963
MISSION BLVD over MISSION CREEK
Built 1929
INTERSTATE 680 over SR 238 (MISSION BLVD)
Built 1963
SHERIDAN ROAD over INTERSTATE ROUTE 680
Built 2020
PALM AVE over INTERSTATE 680
Built 1971
Bridge Details
- Structure #
- 33C0476
- Year Built
- 1998
- Length
- 15.2 m (49.9 ft)
- Max Span
- 4.9 m
- Width
- 3.7 m (12.1 ft)
- Lanes
- 1
- Daily Traffic
- 150
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.