BUSCH TO EL CHARRO over ARROYO MOCHO

2000 FT S OF 580 · County 001, California · Built 2003 · 2 Lanes · 7,700 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
33C0458
Year Built
2003
Length
67 m (219.8 ft)
Max Span
33.4 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
7,700
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.