VALLECITOS ROAD over ARROYO DEL VALLE
450 FT NW OF VINEYARD AVE · County 001, California · Built 1940 · 2 Lanes · 19,250 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
37.645919, -121.786958
This bridge is in worse condition than 93.7% of bridges in County 001. The average bridge in California is 0 years old; this one is 86 years old.
Nearby Bridges
ST RTE 84 (ISABEL) over ARROYO DEL VALLE
Built 1983
ARROYO ROAD over DRY CREEK
Built 1930
HOLMES STREET over ARROYO MOCHO
Built 1939
ARROYO RD over ARROYO MOCHO
Built 1987
SERVICE ROAD over PEDESTRIAN WALKWAY
Built 1923
VETERANS ROAD over ARROYO VALLEY
Built 1992
STANLEY BLVD over ARROYO MOCHO
Built 1940
STANLEY BLVD over STATE ROUTE 84 (ISABEL)
Built 2003
CONCANNON BLVD over ARROYO MOCHO
Built 2003
ST RTE 84 (ISABEL) over ARROYO MOCHO
Built 2003
Bridge Details
- Structure #
- 33C0423
- Year Built
- 1940
- Length
- 75 m (246.1 ft)
- Max Span
- 11.6 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 19,250
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,662,000
- Total Project Cost
- $2,793,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.