ISHERWOOD WAY over ALAMEDA FLOOD CNTRL CHNL
AT PASEO PADRE · County 001, California · Built 1980 · 2 Lanes · 7,200 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
37.572208, -122.014011
This bridge is in worse condition than 45.2% of bridges in County 001. The average bridge in California is 0 years old; this one is 46 years old.
Nearby Bridges
DECOTO RD over ALAMEDA CREEK
Built 1967
DECOTO ROAD over ALAMEDA CREEK TRIBUTARY
Built 1920
ALVARADO-NILES RD over RR TRACKS: BART UPRR
Built 2017
STATE ROUTE 84 over INTERSTATE 880
Built 1984
S880-W84 CONNECTOR over PEDESTRIAN WALKWAY
Built 1990
INTERSTATE 880 over CRANDALL CREEK
Built 1958
ALVARADO-NILES RD over DRY CREEK
Built 1957
ALVARADO-NILES RD over DRY CREEK
Built 1978
PASEO PADRE PKWY over INTERSTATE 880
Built 1981
SR 84 (THORNTON) over INTERSTATE 880
Built 1997
Bridge Details
- Structure #
- 33C0135
- Year Built
- 1980
- Length
- 88.4 m (290 ft)
- Max Span
- 21.3 m
- Width
- 11.5 m (37.7 ft)
- Lanes
- 2
- Daily Traffic
- 7,200
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.