CROW CANYON RD over CROW CREEK

0.7 MI N/O I-580 · County 001, California · Built 1971 · 4 Lanes · 28,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
33C0077
Year Built
1971
Length
17.5 m (57.4 ft)
Max Span
15.9 m
Width
33.5 m (109.9 ft)
Lanes
4
Daily Traffic
28,800
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.