I 80 WB over UTILITY TUNNEL & PUC

04-ALA-080-2.00-OAK · County 001, California · Built 1949 · 17 Lanes · 265,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
33 0543L
Year Built
1949
Reconstructed
1981
Length
26.3 m (86.3 ft)
Max Span
7 m
Width
93.7 m (307.4 ft)
Lanes
17
Daily Traffic
265,000
Material
Concrete
Design
Other
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.