S980-S880 CONNECTO over 5TH I880 6TH 7TH MLK JEF

04-ALA-980-0.02-OAK · County 001, California · Built 1985 · 3 Lanes · 67,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
33 0483F
Year Built
1985
Reconstructed
1990
Length
551.1 m (1808.1 ft)
Max Span
39.9 m
Width
16.5 m (54.1 ft)
Lanes
3
Daily Traffic
67,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.