INTERSTATE 680 NB over STATE ROUTE 237 (FUTURE)
04-ALA-680-M0.04-FMT · County 001, California · Built 1971 · 3 Lanes · 61,000 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
37.465844, -121.904975
This bridge is in worse condition than 93.7% of bridges in County 001. The average bridge in California is 0 years old; this one is 55 years old.
Nearby Bridges
INTERSTATE 680 SB over STATE ROUTE 237 (FUTURE)
Built 1971
INTERSTATE 680 NB over SCOTT CREEK RD
Built 1971
INTERSTATE 680 SB over SCOTT CREEK RD
Built 1971
INTERSTATE 680 NB over DEPT OF WATER RESOURCES
Built 1971
INTERSTATE 680 SB over DEPT OF WATER RESOURCES
Built 1971
ESCUELA PARKWAY over CALERA CREEK
Built 1984
FREMONT BLVD over SCOTT CREEK OVERFLOW
Built 2015
CALIFORNIA CIRCLE over PENITENCIA CREEK
Built 1983
CALIFORNIA CIRCLE over PENITENCIA CREEK
Built 1983
INTERSTATE 880 over SCOTT CREEK
Built 1952
Bridge Details
- Structure #
- 33 0423R
- Year Built
- 1971
- Reconstructed
- 1997
- Length
- 81.7 m (268 ft)
- Max Span
- 35.1 m
- Width
- 21.8 m (71.5 ft)
- Lanes
- 3
- Daily Traffic
- 61,000
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,780,000
- Total Project Cost
- $2,990,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.