INTERSTATE 580 EB over CROW CREEK

04-ALA-580-R28.57 · County 001, California · Built 1988 · 4 Lanes · 98,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
33 0232L
Year Built
1988
Length
81.5 m (267.4 ft)
Max Span
39.7 m
Width
21 m (68.9 ft)
Lanes
4
Daily Traffic
98,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.