BUCHANAN RD (1N01) over NORTH FK TUOLUMNE RIVER

FISH HATCHERY RD (1N04) · County 109, California · Built 2017 · 2 Lanes · 630 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
32C0086
Year Built
2017
Length
52.5 m (172.2 ft)
Max Span
21.3 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
630
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.